Work in Progress

We delivered the photographs. A few small boxes in one large truck.

work-in-truck-on-way-to-gallery

The curator sequenced them and the preparator hung them all on three floors.une-hanging

Kevin and Ilana are positioning and rubbing down the final touch,

                                       LAND  SEA  STONE

And it’s snowing on the first official day of the exhibition. Appropriate.

The show looks good. I’m pleased. If you’re in Portland on January 21, come to the artist reception. Check out the time and location in the previous post as well as the listing of all the events.

Advertisements

One thought on “Work in Progress

  1. tileston says:

    Whoop whoop! We’ll be thinking of you on the 21st 🙂

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

Advertisements
%d bloggers like this: